Corporate Point
This project included the complete renovation of the interior
lobby, corridors, public restrooms, common areas and the upgrade of
four existing passenger elevators. Construction also included the
refurbishment of the lobby fountain and new ADA entrances
throughout the building. Terrazzo flooring, granite and ceramic
tile, as well as architecture millwork and armor coat finishes were
used in the lobby area. The entire remodel of all eleven floors and
atrium was completed in just 95 days.